Project Entry:
City of Luna Pier Seawall Rehabilitation
City of Luna Pier, Michigan;
The Mannik & Smith Group, Inc.
The City of Luna Pier’s seawall was being undermined by a combination of wave action from Lake Erie and annual channel dredging. The rehabilitation design restored the wall’s ability to prevent flooding, ensured that the channel would remain open and was done at low cost with conventional construction materials.